As a first time home-owner I feel like I should have a list of renovations for spring. So I do:

  • Replace main floor carpet with hardwood
  • Build backyard fence
  • Finish second half of basement, including installing bathroom

The last item is probably the most ambitious. I will try to get started on it as soon as possible, although the items are pretty close to priority going forward.

Here are some diagrams of the changes I would like to make in the basement.

Before:

basement_pre_reno1.jpg

After:

basement_after_reno.jpg